Behind the scenes at Temple Mills
13th October 2007
<-- Index | Showing 1-14 of 14 pictures | Index -->
3012 inside the new Temple Mills Depot.
3012 inside the new Temple Mills Depot.
800x533
IMG_2350.jpg
Nose detail of 3012.
Nose detail of 3012.
800x533
IMG_2352.jpg
Bogie showing third-rail shoes retracted.
Bogie showing third-rail shoes retracted.
800x533
IMG_2353.jpg
Inside the shed.
Inside the shed.
500x750
IMG_2367.jpg
TVM test equipment.
TVM test equipment.
800x533
IMG_2375.jpg
Retractable catenary.
Retractable catenary.
500x750
IMG_2377.jpg
Inside Temple Mills.
Inside Temple Mills.
800x533
IMG_2379.jpg
Two types of catenary in the shed.
Two types of catenary in the shed.
800x533
IMG_2383.jpg
The splitability point in the middle of the train.
The splitability point in the middle of the train.
800x533
IMG_2388.jpg
Bogie showing disc brakes.
Bogie showing disc brakes.
800x657
IMG_2397.jpg
3308 at the bogie drop.
3308 at the bogie drop.
800x533
IMG_2403.jpg
Remotely controlled shunter.
Remotely controlled shunter.
800x533
IMG_2408.jpg
Scharfenberg coupling.
Scharfenberg coupling.
800x533
IMG_2415.jpg
3012 surrounded by visitors.
3012 surrounded by visitors.
500x750
IMG_2424.jpg